<img src="https://www.webtraxs.com/webtraxs.php?id=compositeadvantage&amp;st=img" alt="">
    • 1._Sidewalk_panel_stack.jpg
      Sidewalk panel stack
    • 2._Panels_on_truck.jpg
      Panels on Truck
    • 3._Panels_in_place.jpg
      Panels in place
    • 4._Underside_of_sidewalk.jpg
      Underside of sidewalk
    • 5._Completed_sidewalk.jpg
      Completed sidewalk

    Bonney Lake, WA

    Cantilever Sidewalk

    As part of the overall vehicle bridge rehabilitation, a wider sidewalk was added by using lightweight FRP decking on the edge of the bridge. The FRP sidewalk is 106 feet long by 6 feet, for a total area of 636 square feet.

    REQUEST A QUOTE
    Complete Project Summary >

    View a detailed summary including project features and dimensions.

    Resource Center >

    Visit our resource center for technical information packages.